Financing our future energy infrastructure
![]() |
How can the UK best encourage investment into a low-carbon, low-cost energy system while securing energy supplies for the long term? |
Contents |
[edit] Introduction
The Business, Energy and Industrial Strategy (BEIS) Committee is currently examining the evidence that was received as part of its inquiry on financing energy infrastructure.
The inquiry was launched in the wake of investor decisions to halt work on new nuclear projects. These cancellations and suspensions illustrate the growing concerns among investors regarding the competitiveness of delivering new nuclear in the UK.
This is not the inquiry’s whole remit, however. It also looks at challenges in raising finance for renewables and energy storage, the attractiveness of the UK as a destination for energy investment, as well as the role of government in providing support and sharing risk.
[edit] Filling the ‘nuclear gap’
It is unlikely that there is any credible scenario for decarbonisation which does not involve new nuclear to some extent.
Nuclear provides reliable and long-term baseload power and is currently the single largest source of low-carbon electricity in the UK. The Nuclear Sector Deal, announced in June 2017, sets out an ambition to reduce the cost of new nuclear by 30% before 2030, while also committing government support for research on small modular reactors (SMRs).
But the role of renewables in terms of meeting generation needs, carbon reduction targets and delivering value for money is becoming ever more prominent.
The cost of renewables has fallen faster than many predictions and are expected to continue to fall as efficiencies are found and technology develops further.
ICE believes that the government must continue to support low-carbon technologies, including nuclear power, as part of a low-carbon energy mix, via long-term policy frameworks, support through mechanisms like Contracts for Difference (CfDs), as well as R&D funding where appropriate.
[edit] Support for storage
However, without affordable storage providing back-up capacity, the contribution of renewables in helping to replace carbon intensive fuels will be hindered.
ICE’s own State of the Nation 2018 report on infrastructure investment recommended that CfDs be extended to cover energy storage technology and be considered as part of the future repurposing of the UK’s heating network. This is particularly important when considering the growth in demand that electric vehicles will bring to the power network in the future.
ICE’s submission to the BEIS Committee’s inquiry can be accessed here.
[edit] About this article
This article was written by ice.org.uk David Hawkes, ICE Policy Manager. It previously appeared on the website of the Institution of Civil Engineers (ICE) and can be accessed here.Other articles on this website by the ICE can be found here.
[edit] Related articles on Designing Buildings
- Biomass.
- Carbon capture and storage.
- CHP.
- Community energy network.
- Domestic micro-generation.
- Earth-to-air heat exchangers.
- Energy harvesting.
- Energy storage.
- Energy storage - the missing piece?
- Feed in tariff.
- Five key themes for global infrastructure policy in 2021.
- Fuel cell.
- Geothermal energy.
- Geothermal piles
- Ground energy options.
- Ground source heat pumps.
- Large scale solar thermal energy.
- Making the most of renewable energy systems DG 531.
- Renewable heat incentive.
- Solar photovoltaics
- Solar thermal systems.
- Sustainable development: energy challenge.
- Sustainability.
- The Carbon Plan: Delivering our low carbon future.
- The Future of Electricity in Domestic Buildings.
- The future of UK power generation.
- Tidal lagoon power.
- Why the UK needs to support emerging tech like energy storage.
- Will we burn fossil fuels to power wind turbines in the future?
- Wind Energy in the United Kingdom.
- Wind turbine.
- Zero carbon homes.
- Zero carbon non-domestic buildings.
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.